Commercial & Industrial Battery Energy Storage Systems
Polinovel manufactures commercial and industrial battery energy storage systems for EPCs, distributors, and facility owners, covering projects from single-cabinet retrofits to multi-megawatt containerized installations. Our C&I BESS range includes outdoor battery cabinets, scalable microgrid systems, and containerized BESS, integrating LFP batteries, PCS, and EMS for demand management, solar energy storage, and project-specific backup power. Engineered for turnkey deployment, Polinovel systems help reduce demand charges, maintain critical operations during outages, and make on-site solar generation available when it is needed most.
Battery Storage for Commercial and Industrial Facilities Applications


Industrial Parks


Commercial Buildings


EV Charging Stations


Data Centers
Discover More Commercial and Industrial Applications for polinovel
Built for the Way Your Facility Runs
Manufacturing Plants
Heavy machinery creates large, inflexible demand spikes. A high-cycle LFP system shaves those peaks, holds critical processes through brief outages, and runs 24/7 with aggressive cycling.
Solar + Storage Projects
Pair storage with on-site PV to capture surplus generation, push self-consumption higher, and deliver firm, dispatchable power instead of selling solar back at low export rates.
Peak Shaving, Solar Storage and Backup Power
Peak Shaving and Demand Management
Polinovel configures PCS output, EMS dispatch and metering around the agreed grid-import target. The battery supplies part of the load during demand peaks within its power and SOC limits. Recharge power is limited so charging does not create a new demand peak.
01
Time-of-Use Energy Shifting
EMS charging and discharging schedules follow the tariff windows and facility operating hours. We define charging power, discharge limits and minimum SOC together, including the battery energy held for backup and the energy available for daily cycling.
02
Commercial Solar Battery Storage
For PV-plus-storage projects, we define the AC or DC connection, surplus-energy charging and export-control requirements. An AC-coupled configuration connects storage to the site's AC bus. Direct PV connection uses the specified MPPT equipment and input limits.
03
Backup for Essential Loads
Polinovel configures the island-capable PCS, transfer equipment and battery reserve for the agreed essential loads. Motor starting, load steps and generator coordination are included in that architecture. A grid-connected energy-shifting configuration is specified separately from a backup configuration.
04
Cabinet and Containerized C&I ESS Configurations
Use your peak demand (kW) and how many hours of backup or shifting you need to find the right Polinovel platform.
| System | Rated power / battery energy | Configuration and application | Specifications |
| Outdoor cabinet | 60 kW / 121 kWh | Compact cabinet for commercial and industrial loads; define backup equipment separately. | 60 kW / 121 kWh cabinet |
| Outdoor cabinet | 125 kW / 241 kWh | Integrated cabinet for C&I demand management; backup transfer and operating scope are defined for the project. | 125 kW / 241 kWh cabinet |
| All-in-one cabinet | 125 kW / 261.2 kWh | Daily demand management and time-of-use operation; STS and MPPT are optional. | 125 kW / 261 kWh cabinet |
| Scalable microgrid system | 100–250 kW / 241.15–964.60 kWh | Model-specific PV and battery configuration. Battery cabinets are IP54; the microgrid cabinet is IP20. | 241–964 kWh microgrid series |
| Containerized BESS | 625–1,500 kW / 1.206–2.894 MWh | Grid-connected industrial projects with liquid cooling and coordinated PCS/EMS. | 1.2–2.89 MWh on-grid BESS |
| Larger containerized system | 1,900–2,500 kW / 3.858–5.016 MWh | Grid-connected projects with a separate inverter/transformer unit; MV interface 10–35 kV. | 3.85–5 MWh BESS series |
We match AC PCS power to the required demand reduction or essential-load power, and usable AC energy to the discharge duration. The configuration accounts for SOC limits, conversion losses, auxiliary power and end-of-life capacity. The published cabinet range includes 121 kWh, 241 kWh and 261.2 kWh systems; the scalable microgrid series also includes a 482.30 kWh configuration.
The 125 kW / 261.2 kWh cabinet has a 400 V rated AC grid connection and a 650–950 V DC battery operating window. STS and MPPT are optional. AC voltage, DC battery voltage and the selected backup or PV interfaces are stated separately in the configuration.
Understand configuration details
Factory Integration, EMS Control and OEM Configuration
C&I ESS Manufacturing and OEM Supply
Polinovel manufactures outdoor cabinet BESS and containerized energy storage systems for commercial and industrial projects. The supply package identifies the battery, PCS, EMS, cooling, protection and accessories included in the ordered configuration.
We configure system ratings, battery capacity, layout, cooling, cable interfaces, communication and project labeling around the installation and integration requirements. Available options and their limits are defined for the selected model.
The delivery package includes the applicable equipment drawings, datasheets, manuals and agreed factory test records. The project scope separates factory integration from site foundations, AC connections, switchgear, grid-connection work and local installation. About Polinovel manufacturing provides company and production information.
Customized Project Information
How Polinovel BESS Ensures Continuous Operations

Grid-connected operation
For peak shaving and energy shifting, the battery supplies the facility through the agreed connection point. Metering, site import limits and the EMS dispatch settings are coordinated with the existing electrical system.
Backup and hybrid operation
Backup projects use an island-capable PCS, grid-isolation and transfer equipment, and defined essential-load circuits. Generator coordination and PV operation during an outage are included in the selected architecture. Battery + Diesel + ComAp integration covers controller signals and hybrid operating logic.


System Cost and Project Payback
Equipment quotation and supply scope
Polinovel provides the equipment configuration and supply-scope quotation used in the project cost assessment. The quotation distinguishes the BESS package from transport, unloading, foundations, switchgear, transformers, site installation and grid-connection work. Commercial BESS installation cost explains those cost boundaries.
Dispatch and savings assumptions
Power, usable energy, charge/discharge windows and backup reserve determine the energy available for savings. The project financial model uses the local demand-charge rules, time-of-use rates, solar export value, losses, degradation and operating costs. Multiple services share one dispatch schedule and battery-energy budget.
From site information to configuration
Provide the existing site voltage, load data, tariff and PV or generator details. For backup, include the essential loads and required duration. Polinovel uses these inputs to define the system ratings, operating priorities, interfaces and equipment scope; the customer does not need to select a model in advance.
Explore Our Projects
Cabinet and Container Systems for C&I Projects
Find products built for reliability, scalability, and seamless renewable integration to optimize energy dispatch and project outcomes.
C&I Battery Storage Questions
Q: What size BESS does my facility need?
A: It depends on your peak demand (kW) and how many hours of shifting or backup you want. As a rule of thumb: commercial buildings and small plants fit a 60–261 kWh cabinet; industrial parks use 500 kWh–1 MWh cabinet clusters; large factories and microgrids run 1–5 MWh containers. Send us a recent utility bill and we'll size it precisely.
Q: How does peak shaving lower my electricity bill?
A: The system discharges during your highest-demand moments so the grid never registers your full spike. Because commercial tariffs charge for peak kW - not just total kWh - trimming those peaks directly reduces the demand-charge portion of your bill while load remains uninterrupted. Load shifting can stack additional savings on top.
Q: Can it integrate with my existing solar PV?
A: Yes. All Polinovel C&I systems support grid-tied, off-grid and hybrid solar operation. The BMS and EMS coordinate solar, storage and grid so surplus PV is stored for self-consumption instead of being exported at low rates.
Q: Are the systems certified for commercial installation?
A: Our C&I BESS is built to IEC, CE and UN38.3 standards, with advanced battery management, fire and thermal protection. Tell us your destination market and we'll confirm the certifications your project requires - here's why certification matters for permitting, insurance and incentives.
Q: Do you offer turnkey delivery and OEM customization?
A: Yes. Polinovel manages the full lifecycle - design, supply, installation, testing and commissioning - and customizes containerized, cabinet or clustered configurations to your site constraints. OEM and white-label options are available for EPCs and integrators.

Get a C&I Battery Storage Configuration and Quote
Share the project location, site voltage, main application and target schedule. Include peak demand or interval load data, electricity tariffs and any existing PV or generator details. For backup, add the essential-load rating and required duration. Polinovel will prepare a system configuration and equipment quotation for the agreed project scope.














