enLanguage

Dec 19, 2025

Combined Fire and Storage Frequency Regulation System

Leave a message

Battery energy storage systems are used in almost all areas of power production, transmission and consumption. Due to their short response time, fast adjustment speed and high control precision, they bring great expansion and improvement in function or performance to all application areas.

info-566-274

 

Basic Principles of AGC in Thermal Power Units

 

The automatic control system for frequency and active power in a power system is called Automatic Generator Control (AGC). It usually refers to the automatic increase or decrease of target load commands for generating units directly by the power grid dispatch center through the distributed control system (DCS). It is a basic function of generating units.

 

Under the premise of producing high-quality electrical energy, AGC (Automatic Generation Control) satisfies the real-time balance of power supply and demand, and responds to load changes within a few minutes to tens of minutes, thus belonging to secondary frequency regulation. Its fundamental tasks include maintaining the grid frequency within the allowable error range, i.e., frequency error-free adjustment; controlling the net exchange power of the interconnected grid to operate according to the planned value; controlling the exchanged electrical energy of the interconnected grid within the planned limit; and coordinating the power plants (units) participating in remote regulation to operate according to the optimal economic allocation principle, so as to maximize the benefits of the grid, under the premise of meeting the grid safety constraints, grid frequency, and external net exchange power plan, thus participating in tertiary frequency regulation.

 

info-796-477

 

To ensure the safe and stable operation of the power system, there are target requirements for the capacity and adjustable capacity of generating units participating in AGC (Automatic Generation Control) operations. In China's power system, the rated capacity of generating units participating in AGC generally requires that they account for more than 50% of the total installed capacity of the system, and the adjustable capacity of generating units participating in AGC accounts for more than 15% of the system's peak load. Specifically, for thermal power units participating in AGC, when the rated power is P, the power regulation range is generally 50%P to 100%P; the maximum power change rate per minute is 3%P; the load regulation response time should be less than 30 seconds; and for dynamic regulation error, taking a 300MW thermal power unit as an example, the regulation error is less than 3MW, and the maximum error is less than 5MW.

 

 

info-803-539

 

The AGC system, as shown in the figure, mainly consists of the AGC controller at the power grid dispatch center, a real-time transmission channel, a remote control unit (RTU), and the unit's DCS. The power grid dispatch center, based on real-time data on grid load, unit operating status, and grid frequency, remotely dispatches loads to the units, generating AGC commands.

These commands are transmitted to the power plant's RTU via the remote transmission channel, such as through carrier communication. The RTU then transmits the AGC commands as 4-20mA current signals to the unit's DCS. The DCS adjusts the unit's actual power output based on load limits and load change rate setpoints, tracking the AGC commands. Simultaneously, the unit's real-time status, such as actual power output, AGC activation status, load and change rate limits, is converted into 4-20mA signals by transmitters and transmitted to the RTU. The RTU then converts the unit's real-time status into telemetry data, which is transmitted to the power grid dispatch center via the remote transmission channel using high-frequency carrier communication. Therefore, AGC is a remote closed-loop control system for the power production process, built upon a computer-based Supervisory Control and Data Acquisition (SCADA) system, a generator set coordination control system, and a highly reliable information transmission system.

 

The AGC regulation and typical response process of a thermal power unit is shown in the figure:

info-811-357

 

As a paid ancillary service provided by power plants to the power grid, AGC (Automatic Generation Control) is regulated by various regional power grids through corresponding detailed implementation rules for grid-connected generation ancillary service management and grid-connected operation management (referred to as "the two rules"). These rules provide detailed regulations on the performance index calculation and assessment methods for paid ancillary services, including AGC. Taking the "two rules" (2019 revised version) for power plants in the North China regional power grid as an example, the assessment indicators for generator units providing AGC services include the profitability index KA and the regulation performance index Kp, where Kp is shown in the following formula: 

 

Kp=K1×K2×K3

 

In the formula:

K1

regulation rate, 2-(actual regulation rate of the unit / standard regulation rate of the unit).

K2

regulation accuracy, 2-(regulation deviation / allowable regulation deviation)

K3

response time, 2-(unit output response time / standard response time of the unit)

 

The compensation fee for AGC service contribution days is calculated as follows:

A

D-AGC adjustment depth (MW), the cumulative absolute value of AGC commands within a single cycle.

B

Kpd-Performance index, the cumulative value of the adjustability index during the AGC adjustment process within a day.

 

C

Yagc-AGC compensation standard (yuan/MW).

 

 

Send Inquiry